We move your applications and data into the cloud with proven methods and minimal risk. Every migration follows a firm plan that keeps downtime low and safeguards operations throughout.
We move applications and data into the cloud with proven methods, keep downtime {{low}} and safeguard operations throughout.
We capture applications, dependencies and effort and assess cloud suitability.
Application discovery, dependency mapping, assessment, cloud readiness, TCO analysis, migration scope
For each workload we choose the right path between lift-and-shift and modernisation.
6R model, rehost, replatform, refactor, wave planning, migration factory
We prepare a structured target environment for workloads to move into ready for operation.
Landing zone, CAF, network topology, IAM base structure, guardrails, subscription design
We transfer data under control and keep systems in sync during the move.
Data replication, delta sync, cutover, downtime minimisation, rollback, consistency checks
Encryption, access control and provability are part of the migration from the start.
Encryption, IAM, RBAC, network security, compliance controls, audit logging
After the move we optimise cost, performance and operations continuously.
FinOps, rightsizing, monitoring, auto-scaling, cost optimisation, handover to operations
We capture applications, dependencies and their cloud suitability.
We capture your application landscape through application discovery and dependency mapping and assess suitability, effort and cost per workload. Existing dependencies and risks we bring into view.
You receive a prioritised overview of which systems suit well and move first. This assessment determines the strategy in the next step.
We choose the fitting migration path per workload.
For each workload we choose along the 6R model between rehost, replatform and refactor. We plan the move in manageable waves through a structured migration factory.
You receive a solid migration plan with order, paths and effort per system. On this basis we prepare the target environment in the next step.
We prepare a structured, policy-compliant target environment.
We set up a landing zone to the Cloud Adoption Framework with network topology, IAM base structure and guardrails. Encryption and access control we anchor from the start.
Your workloads move into an orderly, safeguarded environment instead of unreviewed defaults. Into this prepared zone we then carry your data.
We transfer data and systems under control and in sync.
We transfer data through data replication and delta sync and keep source and target system in sync up to the cutover. Before switching over we check function and data state in test runs.
The productive switch happens in an orderly way with a prepared rollback option, so downtime stays low. Once switched over, the system passes into governed operation.
We optimise cost, performance and operation continuously.
After the move we optimise cost and performance through FinOps and rightsizing and set up monitoring. Operation and ownership we hand over to your teams in a structured way.
Your migrated environment runs stably, economically and traceably day to day. From daily operation we derive further optimisations continuously.
Migration to proven patterns instead of risky one-offs.
Test cutovers and rollback options safeguard every step.
Backup, monitoring and access are upheld throughout the migration.
Rehost, replatform or refactor, by benefit and risk.
Azure, hybrid models and sovereign options are considered together.
Wave planning and cutover keep interruptions as short as possible.
Answers to the questions we are asked most often about cloud migration.
We talk about the workload portfolio, methods and handover to operations for a safe migration.